Skip to content

You’re browsing a live preview with sample data. Create a free account to play for real.

Workspace Blueprints

Production

New blueprint

Choose a base recipe, substitute inputs for allowed components and pick a finish. Every value is clamped to the base recipe.

Allowed component substitutions

Swap a base input for another catalogue component. A replacement must cost at least as much per unit, so a blueprint can never cheapen the bill of materials.

  • Blueprint name must be between 2 and 48 characters.
  • Blueprint name needs at least one letter or number.

Preview specifications

Machine
saw
Duration
30 min/batch
Energy
20/batch
QA pass mark
50% (premium 80%)
Input value
£90
Output value
£270 (capped at the base recipe)

Bill of materials (per batch)

  • 2 × Timber£90
Cancel